Skip to content
Lewisbands Walk-In TubsConyers walk-in tubs and safer bathing help
Step in, not over

Tub-to-Shower Conversions Help for Safer Bathing

Request an estimate today

A tub-to-shower conversion takes out the old tub and puts in a shower with a low step. You no longer lift your leg over a tall, wet wall. For many people in Conyers, that one change makes bathing feel calm again.

Lewisbands Walk-In Tubs is a referral service. We do not do the work. We explain each step in plain words, then connect you with an independent provider in our network. The provider visits, checks the space, and gives you a written quote. Older houses get extra care, because old pipes and floors can hide surprises under the tub.

Stepping over the wall is the risky part

A standard tub wall stands about 14 to 18 inches tall. You lift one leg, shift your weight, and balance on the other. Wet feet and soap make that move hard. A tub-to-shower conversion takes the wall away. You step in, not over.

What waiting can cost

A shaky bathing habit tends to grow over time. Here is how it often goes.

  • Today: You grab the towel bar or the faucet for balance. Neither one is built to hold your weight.
  • This month: You skip baths, or you wait until someone is home.
  • This season: A near-miss becomes a slip. Hips, wrists and heads take the hit.
  • After a fall: Plans get rushed, and you have fewer choices.

Plan before the fall. You get time to compare quotes and pick the layout you want.

Get Started

Is a conversion right for you?

A conversion fits if you mostly shower and the tub wall is the main problem. It also helps with a sore knee, a weak hip, poor balance, or a cane or walker.

Do you love a long soak? Then a different path may suit you better, such as senior walk-in tubs. A provider can talk through both choices with you.

Your conversion options

  • Prefab insert: A ready-made acrylic or fiberglass shell goes where the tub was. It usually costs less than tile.
  • Tiled shower: Built on site. You get more design choices and more work days.
  • Low-threshold base: A very short curb, an inch or two high. Easy on tired legs.
  • Curbless entry: No curb at all. This suits walkers and wheelchairs, and it is a common choice for handicap accessible showers. The floor often needs extra work.

Older house? Look under the tub

Older homes keep secrets. The tub may have sat in place for decades. Nobody has seen the floor beneath it. Past repairs may hide behind the wall. A provider should check these things before giving a firm price.

Pipes and drains

Old drains may be cast iron or galvanized steel (iron coated in zinc). They rust from the inside. A tub drains in a different spot than a shower base, so the drain may need to move. With a crawl space (a shallow space under the floor), pipes are often easy to reach from below. With a slab (concrete poured at ground level), the floor may need to be cut open.

Walls and floors

A slow leak at the tub edge can soften the floor over months. Humid summers make it worse. Watch for soft spots, stains and a musty smell. Some older wall materials need testing before anyone disturbs them. Ask the provider how they handle that.

How the work unfolds

Day one: the tear-out

The provider shuts off water, removes the tub, and opens the wall. This is when hidden damage shows up.

Next: base and walls

The crew sets the drain, the shower base and the wall panels or tile. Tile needs time to dry and cure (harden).

Last: seal and set

The provider seals the seams, hangs the door or curtain rod, and tests the water. Then you walk through the finished shower together.

How long does it take?

A prefab insert often takes a few days. A tiled shower can take one to two weeks, since each layer must dry. Hidden rot or a moved drain adds days. Providers also book up, so start early. Request a callback to check provider availability.

Get Started

Glass door, fixed panel or curtain?

  • Glass door: Looks clean, but it can be heavy and the track can trip a foot.
  • Fixed panel: One piece of glass with an open gap. No door to swing. Spray can escape.
  • Curtain: Cheap, light and easy to move for a helper. It needs a liner that you can wash.

Plan for the years ahead

Needs change. Build a safe bathing conversion that can change with you.

  • Ask for solid wood blocking inside the walls, so grab bars can go anywhere later.
  • Add a bench seat and a handheld shower head.
  • Choose a floor with good grip, even when wet.
  • Ask about a valve that stops sudden hot water.
  • Leave room for a walker to turn.

If you want tub replacement with a seat and a door instead, ask about that too.

Questions to ask the provider

  • Will you check the floor and drain before you set the price?
  • What happens if you find rot or old damage?
  • Who handles permits?
  • How long will my bathroom be out of use?
  • What does the quote include, in writing?

Take the next step

Get a written quote, and compare it with the plan you want. Request an estimate, and Lewisbands Walk-In Tubs will connect you with a local provider.

Get Started

What's Included

Site visit

The provider measures the bathroom and checks the tub, drain and floor before quoting.

Removal and repair

The old tub comes out. The provider fixes soft floors, worn pipes or damaged walls it finds underneath.

New base and walls

A low-step base and waterproof walls go in, in prefab or tile, as you choose.

Safety add-ons

Ask about grab bars, a bench seat, a handheld sprayer and a grippy floor.

Typical costs for a conversion

Prices vary by home, size and materials. These are typical U.S. ranges only. Older houses can cost more if hidden damage turns up. Always get a written quote from the provider before work starts.

ItemTypical rangeNotes
Prefab shower insert$3,000 – $8,000Fastest option; fewer design choices
Tiled walk-in shower$6,000 – $15,000More work days and cure time
Low-threshold or curbless base$5,000 – $14,000Extra floor work is common
Drain or plumbing changes$500 – $3,500Slabs cost more than crawl spaces
Floor or wall repair$500 – $4,000Depends on how much rot is found
Grab bars, seat and glass door$300 – $2,500Varies by size and style

Get Started

How It Works

Tell us

Fill out the short form with your bathroom, your needs and your timing.

Get matched

We connect you with an independent provider in our network near you.

Review the quote

The provider visits, checks the space and gives you a written quote to compare.

Pick and schedule

You choose the provider and the design. They set the dates and do the work themselves.

Why Call Lewisbands Walk-In Tubs

Plain-English guidance

We explain each step in short, simple words.

Local providers

We connect you with independent providers in our network who work near you.

Older-home care

We point out hidden risks, like old drains and soft floors, before work begins.

No pressure

Request an estimate and compare. You decide what happens next.

Other Services

Need tub-to-shower conversions help in Conyers?

Tell us about your bathroom and what worries you. Request an estimate, and Lewisbands Walk-In Tubs will connect you with an independent provider in our network. No obligation.

No obligation
Questions

Tub-to-Shower Conversions Help FAQ

  1. How much does it cost to convert a tub to a shower?

    Most U.S. projects run from about $3,000 for a simple prefab insert to $15,000 or more for custom tile. Hidden damage, drain changes and safety add-ons can raise the price. Get a written quote first.

  2. How long does a tub-to-shower conversion take?

    A prefab insert often takes a few days. Tile takes longer because each layer must dry. Surprises under the tub can add more time.

  3. Can a tub be converted to a shower in an older house?

    Yes, but older homes need a closer look. A provider checks the drain, pipes, floor and walls first. Repairs may be needed before the new shower goes in.

Contact

Tell us what happened

Tell us about your bathroom and what worries you. Request an estimate, and Lewisbands Walk-In Tubs will connect you with an independent provider in our network. No obligation.

No obligation
Request a callback